WASA Rawalpindi prices a home from the plot size when there is no meter, and from gallons when there is one. The bands on this page are ranges. The rupee figure on your bill is the one you pay.

Read the category off the live bill. Check the WASA Rawalpindi bill with the 10-digit consumer ID. Lahore uses a different tariff and an 8-digit account.

WASA Rawalpindi sits with the Rawalpindi Development Authority and the Punjab housing and public health department. Supply on this guide is from Rawal Lake, Khanpur Dam, and tubewells. A house in Khayaban-e-Sir Syed, Satellite Town, or on Murree Road is in this system. A house in Lahore is on the Lahore tariff.

Flat rate or a meter

Most homes are unmetered. The charge follows plot size in marla or kanal, and covered floor area, whether or not you used that much water. Metered billing is for bulk homes, commercial buildings, industry, and the residential pockets where a meter is actually fitted. Those bills follow gallons or cubic feet.

Unmetered homes

The monthly base below is the range this guide lists. Most residential sub-divisions are billed every two months, so the invoice is two months of water plus sewerage.

PlotAreaMonthly base waterAbout two months of that base
Up to 3 marlaUp to 675 sq ftRs. 180 to Rs. 250Rs. 360 to Rs. 500
3.1 to 5 marla676 to 1,125 sq ftRs. 300 to Rs. 420Rs. 600 to Rs. 840
5.1 to 7 marla1,126 to 1,575 sq ftRs. 450 to Rs. 580Rs. 900 to Rs. 1,160
7.1 to 10 marla1,576 to 2,250 sq ftRs. 650 to Rs. 820Rs. 1,300 to Rs. 1,640
10.1 to 15 marla2,251 to 3,375 sq ftRs. 900 to Rs. 1,150Rs. 1,800 to Rs. 2,300
15.1 marla to 1 kanal3,376 to 4,500 sq ftRs. 1,300 to Rs. 1,650Rs. 2,600 to Rs. 3,300
1.1 to 2 kanal4,501 to 9,000 sq ftRs. 2,000 to Rs. 2,600Rs. 4,000 to Rs. 5,200
Above 2 kanalOver 9,000 sq ftRs. 3,200 to Rs. 4,500 and aboveRs. 6,400 to Rs. 9,000 and above

Shops, food, and industry

CategoryExamplesHow it is assessedMonthly base on this guide
A, general retailShops, general stores, offices, clinicsCovered areaRs. 800 to Rs. 2,000
B, food and hospitalityRestaurants, bakeries, hotels, cafesCovered area and seatingRs. 2,500 to Rs. 7,500
C, high water useService stations, car washes, laundriesPipe size, 0.75 inch or 1 inchRs. 8,000 to Rs. 25,000 and above
D, bulkMalls, hospitals, educational plazasA meterThe meter reading

Sewerage

Residential sewerage on this guide is usually 30% to 50% of the base water rate. A base of Rs. 600 would put sewerage between Rs. 180 and Rs. 300.

A property on its own borehole that still discharges into the WASA sewer pays a sewerage-only charge based on the plot. Commercial effluent that needs a grease trap or de-silting can draw a seasonal drainage charge.

Metered gallons

Rates are per 1,000 gallons. A cubic-metre meter is read and then priced on the same kind of steps. These are ranges.

Gallons in the monthDomestic, per 1,000 gallonsCommercial, per 1,000 gallons
Up to 5,000Rs. 40 to Rs. 60Rs. 120 to Rs. 180
5,001 to 10,000Rs. 65 to Rs. 90Rs. 190 to Rs. 260
10,001 to 20,000Rs. 95 to Rs. 130Rs. 270 to Rs. 380
Above 20,000Rs. 140 to Rs. 200Rs. 400 to Rs. 550 and above

Pipe size and an upper floor

  • Half an inch. The ordinary ferrule for a single house, at the base tariff.
  • Three-quarter inch or 1 inch. This guide applies a multiplier of 1.5 to 2.5 on the base.
  • Another kitchen or portion. Ground plus first floor, or a further portion, can add a unit charge or a percentage for each extra portion.

Two examples

Both use a 40% sewerage share, inside the 30% to 50% band, and a bi-monthly bill. They show the arithmetic. They are not a substitute for the bill.

A 5-marla house, no meter. Base water Rs. 350 a month, which sits inside the Rs. 300 to Rs. 420 band. Two months are Rs. 700. Sewerage at 40% is Rs. 280. Payable before the due date in this example: Rs. 980.

A 10-marla house with an upper portion. Base water Rs. 700 a month, inside the Rs. 650 to Rs. 820 band. The upper portion in this example adds 50%, which is Rs. 350, so the monthly base is Rs. 1,050. Two months are Rs. 2,100. Sewerage at 40% is Rs. 840. Payable before the due date in this example: Rs. 2,940.

After the due date

This guide states a 10% late surcharge on the current bill if you pay after the due date. Unpaid amounts carry forward as arrears and can take another 10% in a later cycle. A provincial levy can also appear. How to see whether a payment posted, and the 1Bill prefix 100052, are in the payment-status guide.

The category is wrong, or you want a meter

A 5-marla house billed as 10 marla, or a home billed as a shop, is a category correction. Ask for that form at the revenue office. Attach the registry, fard, or approved plan that shows the plot. File it at the Liaquat Bagh revenue counter. An inspector visits. The Assistant Director Revenue then resets the base and can correct earlier overbilling.

A meter is a written request at the same directorate. Engineers inspect and issue a demand notice for the meter and the installation. This page does not print that fee.

Revenue office

Directorate of Revenue, RDA Complex, Murree Road, near Liaquat Bagh, Rawalpindi. (051) 9290135 and (051) 9270011. Tariff assessment, category corrections, and bill splits.

Public dealing: Monday to Thursday 9:00 AM to 5:00 PM, Friday 9:00 AM to 1:00 PM, Saturday 9:00 AM to 3:00 PM. Closed Sunday and on gazetted holidays. The wider list is the office directory. A new connection is the connection guide.

Frequently asked questions

Most residential sectors are bi-monthly. One invoice covers two months of water and sewerage. Some categories are monthly. The cycle printed on the bill is the one that applies.

Covered area, an upper-floor portion, or a wrong plot category will do it. Ask for a site reassessment at the revenue office and take the papers that show the real plot.

Yes, if the wastewater goes into WASA’s sewer. That charge is the sewerage-only fee, based on the plot.

This guide states 10% of the current bill if you pay after the due date. Confirm the figure on the bill before you pay the higher amount.

Yes. A written application at the Revenue Directorate in Liaquat Bagh starts it. Engineers inspect the site and issue a demand notice for the meter and the installation. The notice carries the fee.

Official sources to check:WASA Rawalpindi official website