A new house in Faisalabad, a shop in Sargodha, or a plot in Jhang needs a regular FESCO meter before monthly bills can start. That is a different job from a temporary construction or wedding connection, from moving a pole or a meter, or from closing a line and claiming the security deposit. This guide covers only a permanent new connection.

FESCO's About page lists its area as Faisalabad, Sargodha, Mianwali, Khushab, Jhang, Bhakkar, Toba Tek Singh and Chiniot districts. If your plot sits outside those districts, this is the wrong company. billhelp.pk is unofficial. We explain the official rules so you can follow them. We do not issue connections or demand notices. Once the meter is live, you can check or download your FESCO bill here.

Apply in the app, or at the facilitation centre

FESCO's e-Services page still links “Online Electricity New Connection (ENC) Application” to the FESCO ENC portal, and the national ENC site also sends FESCO users there. When we opened https://fesco.enc.com.pk/ on 27 November 2026, a notice at the top asked people to use the Power Smart or FESCO Smart app, e-OPS, or the nearest customer facilitation centre (the sub-division office) for a new connection, or for a change of name, tariff or load. The public Apply and Change links were not shown. Track, Print Form, Print Demand Notice, Pay Demand Notice and Upload Demand Notice were still listed, which helps if you already have a file.

On 21 April 2026, Associated Press of Pakistan reported a FESCO spokesman as saying these services had moved to the Power Smart and FESCO Smart apps, that ENC filings up to 31 March 2026 would still be processed, and that offices would keep helping people who cannot use a phone app. Follow the live portal notice, and the papers and time limits in NEPRA's Consumer Service Manual (revised November 2025), which FESCO publishes on its templates and forms page.

For most homes and shops, install Power Smart or FESCO Smart. Both name PITC, or Power Information Technology Company, as the developer; check that name before you install. The Power Smart listing on Google Play, updated 29 October 2026, includes New Connection. FESCO Smart is also on the App Store. Open the new-connection option and keep the number the app gives you. If you cannot use the app, go to the facilitation centre at your sub-division office. FESCO's FAQ still says the paper form is free there and that the clerk issues a receipt; keep it. The same form, in Urdu and English, is also posted as a PDF on e-Services (dated 16 January 2024). The ENC notice also names e-OPS at eops.pitc.com.pk; that portal opens to a login, so a household should use the app or the office.

Papers the current manual asks for

Chapter 2 of the November 2025 manual sets the papers that go with the application. FESCO also hosts a specimen owner NOC (CP Form 03-A, dated 01 November 2017) on the templates page.

  • Proof of ownership of the premises, in the form FESCO accepts. Getting a meter is not itself proof that you own the property.
  • An affidavit by the owner on Rs 50 non-judicial stamp paper (or the updated stamp value). It must say that no connection existed at the premises before, that you will pay any old dues if they turn up later, and that you are not a defaulter on another electricity connection. If you are later found to be a defaulter, the manual allows disconnection after seven days' notice.
  • If you are a tenant, or anyone other than the landlord: a no-objection certificate from the owner, the owner's ownership proof and affidavit, the landlord's attested CNIC, and a separate Rs 50 stamp paper in which the owner affirms they will cover bills if the tenant misses three months in a row.
  • Attested copies of the applicant's CNIC and of one witness.
  • A wiring test report issued by the Electric Inspector or an authorised wiring contractor.
  • An approved map, site plan, layout plan or civic-agency NOC, unless a manual exception applies, such as many rural plots, a house inside an already approved housing scheme, or an old abadi of inherited family land. Ask the office if a map is still needed for your plot.
  • If the application is in a company's name: the certificate of incorporation, a board resolution authorising the signatory, and a list of directors with addresses and CNIC copies.

The demand notice, the deposit and FESCO's cost calculator

After the site survey, FESCO issues a demand notice for the capital cost or connection charges and for the security deposit. Pay only the amount written on that notice. Annexure IV of the same manual sets these rates for ordinary homes and shops: residential (A-1) Rs 1,220 per kW in an urban area and Rs 610 per kW in a rural area; commercial (A-2) Rs 1,810 per kW in an urban area and Rs 920 per kW in a rural area. The notice shows the figure for your load and tariff.

You have 30 days to pay. You may ask for a further 30 days of grace, but that request must reach FESCO at least three days before the due date. Instalments can be allowed on request, with no mark-up. The meter is installed only after full payment, and the remaining time in Annexure III runs from then. If material prices rise during instalments, the extra cost is yours, except that a home of up to 20 kW or a shop of up to 15 kW is spared escalation after the installation time has already passed.

FESCO's e-Services page also links a New Connection Cost Estimates Calculator (for Material), titled “Estimated Cost Calculator (Upto 500kW)”. It adds unit prices for poles, conductors, transformers, meters and fittings. Treat it as a material estimate, not as the full demand notice, which also includes the security deposit and any other approved charges. If you already have a demand notice, the FESCO ENC portal still lists Pay Demand Notice and Upload Demand Notice.

How long the manual gives FESCO

FESCO's public FAQ still says a new connection “would be installed in One Month.” The binding time frame is Annexure III of the November 2025 manual. For a typical home or shop of up to 15 kW at 400 V (Category 1, usually handled by the SDO), the company's own steps add up to 30 days (4 days to register, survey and verify the wiring test report; 6 days to issue the demand notice; then, after payment, 11 days for the work order and 9 days to install the meter). For a load above 15 kW and up to 70 kW (Category 2, usually the XEN), the same annexure totals 44 days.

If FESCO misses a deadline in that table, the manual says it must give reasons in writing for each day's delay, with a copy to NEPRA, and the duty to issue the notice or provide the connection still stands. The FESCO ENC portal also notes that date-wise priority for new connections has been enforced since March 2022, as per orders of the Authority.

Track the file, or get help if it stalls

Keep the application, registration or acknowledgement number from the app or from the clerk's receipt. Use the track option in the app if it is offered, quote that number at the office, or use Track Application on the FESCO ENC portal for a file that was already entered there. If the file sits still, start with the routes in our guide to the FESCO helpline and complaints: 118, the UAN 0800-66554, SMS 8118, or a written case on CCMS. Ask for a ticket number and keep it. Once the first bill arrives, use the FESCO bill page to check or download it.

Questions people ask

Can I still apply on fesco.enc.com.pk?

FESCO's e-Services page still links there, but the portal's own notice on 27 November 2026 asked new applicants to use the Power Smart or FESCO Smart app, or to visit a facilitation centre. Track and pay tools on the portal may still help an older file.

Is the form free, and is the work always done in a month?

Yes, the paper form is free at the sub-division, and FESCO also posts it online. For loads up to 15 kW, the manual's steps total 30 days, and work after the demand notice starts once you have paid it in full.

How do I track the application?

Keep the number the app or the clerk gives you. Use the track option in the app, quote it at the office, or use Track Application on the FESCO ENC portal for a file already entered there.

Can I pay the demand notice late?

You have 30 days. You can ask for 30 more days of grace if the request reaches FESCO at least three days before the due date. Instalments may be allowed, but the meter is installed only after full payment.

I am only building, or I already have a meter. Is this the right guide?

No. For a short-term supply, use the temporary connection guide. To move a pole or a meter, use the shifting guide. To close a line and get the deposit back, use the permanent disconnection guide.